Magic Band DXCC goal achieved ! One year earlier as expected.
So time for my ultimate HF challenge : DXCC on Topband.
During the last years, I collected some hardware to play on topband, but all of this stayed the boxes.
Since this weekend I'm migrated to only one band : 160m.
Steppir and 30m vertical stay operational in case of a new ATNO DXCC, but are not connected to the shack.
On my first coaxial hardline I've an inverted L, the second hardline provides connection to a remote switch with the possibility to connect up to 4 receive antennas.
As always my 2 basic principles are implemented :
1. Keep it as simple as possible. No complex array solutions, beverages only if really needed.
2. Follow the Pareto principle. 20% effort to achieve 80% result. Therefore I don't want to work 300 countries, I just want 100 countries, no WAZ, no WAS even not a WAC if too difficult.
At this time I've 63 confirmed countries on topband.
Geen opmerkingen:
Een reactie posten